Importance of Master plan in an Industrial project
A document that gives a layout of the long-term development of the land is a Master Plan. In any industrial project, the architect and engineer must develop a master plan at the start of the project. This document helps in planning the usage of land. It provides for a long-term, structured, sustainable development roadmap.
How to Prepare a Master Plan?
Creating a master plan is a long, drawn process with brainstorming sessions resulting in developing a strategy for land development. The master plan is a road map to the future of the organization. The roadmap is achieved after detailed and intense discussions with various project stakeholders. It is an iterative process before reaching a consensus.
The industrial architect should keep in mind not to limit flexibility. A flexible master plan helps in incorporating new technologies.
A masterplan must consider the following:
- The priority of each building
- Budget constraints if any
- Cash outflow timeline
- Project Timeline
- Planning in terms of manpower and production
- Branding
- Zoning of each area
The industrial architect should prepare the master plan with an eye on the local codes & regulations, and geophysical and geotechnical surveys. The development of site infrastructure is also based on the master plan.
An industrial architect needs to prepare a master plan at the start of an industrial project.
Comments
Post a Comment